From plan to completed building

Execution with one
accountable team.

Experienced managers and crews carry the project from coordinated planning into field construction, with the owner’s priorities connected to scheduling, subcontractors, workmanship, and follow-through.

Owner-led

Continuity

35 yrs

Construction experience

Licensed

Bonded and insured

Long-term

Client support

Stage 01 · Foundation and framing

Start square, strong, and ready for the region.

Published foundation options include poured slab, crawlspace, or full basement depending on soil, climate, and design. Work may include excavation and soil review, forms and rebar, concrete pouring and curing, applicable waterproofing, drainage grading, wall framing, trusses or rafters, sheathing, floor systems, and regional wind- and snow-load bracing.

Stage 02 · Exterior shell

Get the building dried in.

The exterior stage closes the building against weather with metal or shingle roofing, flashing and underlayment, windows, exterior doors, house wrap or moisture barrier, and the selected siding. Published siding choices include metal, LP SmartSide, and wood.

Plumbing, electrical, and HVAC rough-ins are installed and inspected before finishes conceal them. Published optional upgrades include backup generators, in-floor heat, water-filtration systems, and smart-home wiring.

Stage 03 · Systems coordination

Coordinate everything behind the walls.

Stage 04 · Finishes and final details

Turn the structure into a finished space.

The finish stage can include batts or spray-foam insulation, drywall, interior doors and trim, cabinetry, flooring, fixtures, painting, wood finishes, testing, and final cleaning. Throughout construction, the published process includes progress updates, photo documentation, scheduling expectations, and responses to owner questions.

Verified client feedback describes Shetler’s returning to adjust doors, repair damaged brick, and reinforce storm-affected attic boards after completion. Depending on the signed project agreement, warranty coverage can address both workmanship and eligible materials. Exact scope, duration, exclusions, and manufacturer responsibilities are documented in writing.

Completion, warranty, and support

The relationship does not end at handoff.

Documented work

Related project profiles

Planning questions

What owners ask us.

Who coordinates the project during construction?

Shetler’s connects owner involvement, managers, crews, subcontractors, and project priorities through the construction phase.

A verified commercial client review specifically notes that the crew was quick to pivot on last-second design ideas, though early planning remains the best time to make major decisions.

Client reviews describe continued support after completion, including adjustments and repairs. Warranty scope, duration, eligible materials, exclusions, and manufacturer processes are governed by the signed project agreement.